No products in the cart.
Danfoss Pilot Valve, Evm Nc 027B1120 | Industrial Valves
Image is for illustration only. Please go by the model number (SKU: 027B1120).
-45%Roll over image to zoom in
$736.99$1,339.98 (-45%)
Price Match*
Price Match*
⚠️ Important Compatibility Notice
Please double-check the required specifications with your qualified technician or installer prior to ordering. Due to the technical nature of this product, incorrect orders cannot be exchanged, replaced, or refunded. Thank you for your understanding.
Danfoss Pilot Valve, Evm Nc: Commercial Grade Reliability
You are viewing the Danfoss Pilot Valve, Evm Nc (027B1120). This is a genuine, high-specification Industrial Valves component designed for professional installations. Whether you are fitting out a commercial HVAC system, upgrading industrial refrigeration infrastructure, or handling a residential maintenance job, this unit delivers the engineering standard required for New Zealand conditions.
Technical Specification: Danfoss 027B1120
| General Information | |
|---|---|
| Function | NC |
| Model Number | 027B1120 |
| Product Group | Control Valves |
| Type | EVM NC |
| Additional Info | |
| Family | ICS + EVM |
| Coils | |
| Coil | No |
| Connections | |
| Connection Type | Thread |
| Inlet Type | Thread |
| Kv Values | |
| Kv Value | 0.280 m³/h |
| Logistical Information | |
| Commodity Code | 84818079 |
| Country Of Origin | POL |
| EAN | 5702422007128 |
| Gross Weight | 0.252 kg |
| Material | |
| Body Material | Steel |
| Measurements | |
| Net Weight | 0.25 kg |
| Pressure | |
| Max OPD, 10W AC | 21 Bar |
| Max Operating Pressure | 65.0 Bar |
| Refrigerant | |
| Refrigerant | R22, R134a, R401A, R402A, R404A, R407A, R407B, R407C, R407F, R409A, R410A, R421A, R502, R507A, R717, R744 |
| Standards | |
| Approval | EAC, LLC CDC TYSK |
| Temperature | |
| Ambient Temperature Range | -40-80 °C |
| Medium Temperature Range | -60-120 °C |
| Valves | |
| Actuator Size | 13.5 mm |
| CV Value | 0.324 gal/min |
| Direction | None |
| Orifice Size | 3.30 mm |
| Valve Operation | SERVO-PISTON |
💡 Pro Tip: Ensure this 027B1120 matches your system requirements.
Need more options? Explore our complete range of professional Components Supplies available for NZ-wide delivery.
Additional information
| Weight | 0.252 kg |
|---|---|
| MPN | |
| Brand | |
| Copper Pipe (mm) | |
| Refrigerant |
Only logged in customers who have purchased this product may leave a review.




Reviews
There are no reviews yet